SWAN 2 Concentrator Installation and Support Guide
Replacing a Power Supply
SWAN 2 Concentrator Installation and Support Guide—429593-010
10-5
Install the Replacement Power Supply
Install the Replacement Power Supply
1. Disconnect the grounding clip of your ESD wriststrap from the antistatic mat and
connect it to an unpainted metal surface on the replacement power supply.
2. Grasp the power supply by its ejector in one hand, support the bottom edge of the
power supply with the other hand, carry the power supply to the front of the
SWAN 2 concentrator rack, and set it down on an antistatic mat rightside up with
its label readable.
3. Disconnect the grounding clip of your ESD wriststrap from the replacement power
supply and connect it to an unpainted metal surface on the front of the SWAN 2
concentrator rack.
4. Unlatch the power supply ejector and pull it to the left to unlock the power supply.
5. Using two hands, line up the power supply with the guides inside the power supply
slot.
6. Carefully push the power supply all the way into the power supply slot.
7. Press the power supply ejector to the right until the power supply locks into place.
8. Disconnect the grounding clip of your ESD wriststrap from the SWAN 2
concentrator rack.
Note. The power supply weighs 2.8 pounds (1.27 kilograms).
VST705.vsd