SWAN 2 Concentrator Installation and Support Guide
SWAN 2 Concentrator Installation and Support Guide—429593-010
2-27
Install the Cable Management Kit
d. Align the D-ring and universal mounting bracket with the rack.
e. Use a T-25 Torx screwdriver to secure the universal mounting bracket to
the rack with two M5 screws. Make sure that the bracket is tightly secured
so that any cables held by the D-ring will be secure.
D-Ring
Universal Mounting Bracket
M5 Screws
VST740.vsd