SWAN 2 Concentrator Installation and Support Guide

Diagnosing Problems
SWAN 2 Concentrator Installation and Support Guide429593-010
4-5
Executing the OSM or TSM Test Verify Action
Executing the OSM or TSM Test Verify Action
The OSM or TSM Test Verify action requires you to perform tasks on the CLIP you are
testing before and after the action is executed. Note that TSM is not supported on
Integrity NonStop NS-series systems.
Before Executing the Test Verify Action
1. If there are WAN lines using the CLIP, you must stop them. Example 4-1 shows
how to stop two WAN lines named $X25L1 and $X25L2.
2. Stop the data link control (DLC) TASK objects on the CLIP. Example 4-2 shows
how to stop the DLC TASK objects on CLIP 1 for the SWAN 2 concentrator named
S01.
3. Terminate the operation of the CLIP. Example 4-3 shows how to abort CLIP 1 for
the SWAN 2 concentrator named S01.
After Executing the Test Verify Action
1. Restart the CLIP. Example 4-4 shows how to start CLIP 1 for the SWAN 2
concentrator named S01.
2. Restart the DLC TASK objects on the CLIP. Example 4-5 shows how to start the
DLC TASK objects on CLIP 1 of the SWAN 2 concentrator named S01.
Example 4-1. Stopping WAN Lines
STOP LINE $X25L1
STOP LINE $X25L2
Example 4-2. Stopping DLC TASK Objects
STOP TASK $ZZWAN.S01.1.*
Example 4-3. Aborting a CLIP
ABORT SERVER $ZZWAN.S01.1
Example 4-4. Starting a CLIP
START SERVER $ZZWAN.S01.1
Example 4-5. Starting DLC TASK Objects
START TASK $ZZWAN.S01.1.*