SWAN Concentrator Installation and Support Guide

Contents
SWAN Concentrator Installation and Support Guide429391-006
v
Tables
Tables
Table 1-1. SWAN Concentrator AC Power Requirements 1-2
Table 2-1. Model Numbers for the SWAN Concentrator and Cables 2-2
Table 2-2. SWAN Concentrator Installation Summary 2-3
Table 2-3. Indicator LEDs 2-22
Table A-1. Estimated Time Required for the Firmup Procedure A-2
Table B-1. RJ-45 Connector Pinout B-1
Table B-2. Pinout of WAN Port Connector for RS-232 Connections B-3
Table B-3. Pinout of WAN Port Connector for RS-449 Connections B-5
Table B-4. Pinout of WAN Port Connector for X.21 Connections B-7
Table B-5. Pinout of WAN Port Connector for V.35 Connections B-9
Table B-6. Unsupported WAN Signals B-12
Table B-7. RS-232 Interface Converter Cable Wiring B-16
Table B-8. RS-449 Interface Converter Cable Wiring B-17
Table B-9. X.21 Interface Converter Cable Wiring B-18
Table B-10. V.35 Interface Converter Cable Wiring B-19
Table B-11. Loopback Test Connector Wiring B-20
Table B-12. ISEL Decoding B-21