Tandem Capacity Model (TCM) Manual

Use TCM to:
Load the baseline into the Performance model
Modify scenarios and make projections
Create charts of possible scenarios
Reporting Results
The final step in the capacity planning process is reporting the results.
Once you have determined the system resource needs, report the results to management. TCM
helps you create a capacity plan using your Performance model projections and presentation-quality
charts that are easy to read and understand.
24 Introduction