TRANSFER Installation and Management Guide
System Installation Procedures
6–38 068837, Update 1 to 013198 Tandem Computers Incorporated
18. Enter this command:
10> RUN XCOOL
to cool start the TRANSFER PATHWAY system. (XCOOL resides on your
configuration subvolume).
19. Initialize special TRANSFER depots.
20. Shut down the TRANSFER PATHWAY system to make sure that everything is
written to the disk, using this command:
1> RUN XSTOP
XSTOP resides on your configuration subvolume.
TRANSFER Initial Installation Summary