Virtual TapeServer 6.03.41 Installation Guide

Cabling and Connecting VTS | 25
Powering up and down
Plug the power cords into grounded electrical outlets; it is recommended that the cables be
routed to separate power sources for redundancy.
Note Power up the SCSI converter before the VTS server module. Power down the SCSI
converter before powering down the VTS server module.
To power up
1. Power up the VTS SCSI converter using the power switch on the rear panel.
2. Press the power button located on the front panel of the VTS server module. The power
button on the front panel changes from yellow to green, and the server module self-boots.
To power down
1. Execute the halt command by clicking Supervisor Tools on the navigation pane of the
user interface and then clicking Halt the System.
2. Press the power button located on the front panel of the VTS server module. The button
light changes from green to yellow.