Virtual TapeServer 8.3 Configuration Guide
102 | Virtual TapeServer Configuration Guide
d. In the Create Schedule area, select how often you want the job to occur from the
following options.
l One time — Runs the job once. You must select a start date and time.
l Weekly/Daily — Runs on the days you select. You must select the days and a
start date and time.
l Monthly — Runs on a specific date each month. Select a date and start time.
If you specify a date that does not exist in a month, the job will run on the last day of
the month.
e. Click Save.
After the job runs, you can return to the Managed Schedules page for its status. If a problem
occurred, the Last Run column will display “Failed”.
If data is stored on the virtual tape, it is encrypted. If the virtual tape is empty, data will be
encrypted as it is written to the virtual tape.