HP LeftHand 4330 10 GbE SFP+ Installation Instructions (BQ891-96004, November 2012)

Table 4 storage system network configuration
post-migration
ModeSpeedNIC
Slave (Bond0)1 GbEFlexLOM:Port1
Slave (Bond0)1 GbEFlexLOM:Port2
Disabled1 GbEFlexLOM:Port3
Disabled1 GbEFlexLOM:Port4
Logical Failover
Device (ALB)
1 GbEBond0 Type
Slave (Bond1)10 GbENICSlot1:Port1
Slave (Bond1)10 GbENICSlot1:Port2
Logical Failover
Device (ALB)
10 GbEBond1 Type
IP address preparation worksheets
Record the following information and keep this
information available throughout the migration process
for each storage system.
In Table 5 (page 3), enter information about the
storage system before it is updated. In Table 6 (page
3), enter the information about the storage system
you will use during the update.
Table 5 Pre-upgrade storage system information
NIC IP address
VIP address
If bonds are configured:
Bond0 IP address
Bond1 IP address
If bonds are not configured:
FlexLOM:Port1 IP
address
FlexLOM:Port2 IP
address
FlexLOM:Port3 IP
address
FlexLOM:Port4 IP
address
Table 6 During upgrade, use this storage system
information
Bond0 IP address to use
Cluster VIP (if different
from the cluster VIP in
Table 5 (page 3))
Shut down the management group
1. Halt all I/O to the volumes.
2. Using the iSCSI initiator, log off all the volumes
attached to this cluster.
3. Right-click the management group in the
navigation window and select Shutdown
Management Group to place the group into
Maintenance mode. The following message
opens:
4. Click Shut Down Group. A confirmation message
opens.
5. Click Shut Down Group to continue the shutdown
process.
6. Verify that all the storage systems in the
management group are powered OFF.
Installing or replacing the 10 GbE board
Have the following items ready:
HP StoreVirtual 4030 10G BASE-SFP+ Upgrade
Kit, which includes the HP NC552SFP 10Gb
2-port Ethernet Server Adapter
T-15 Torx screwdriver
To install or replace the 10 GbE board:
Page 3