Figure 9 Service clearances for a six rack system
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 16 (page 31).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 16 Floor load rating and required clearances for a six rack configuration
Required Clearance (a+b) mFloor Load