Hitachi Global Link Manager Software Installation and Configuration Guide
Types of Global Link Manager Cluster Installations
This section describes the types of Global Link Manager installations in a
cluster environment.
There are five types of Global Link Manager installations in a cluster
environment:
• Setting up a Global Link Manager cluster for a new installation
• Setting up a Global Link Manager cluster for a reinstallation or version
upgrade installation
• Setting up a Global Link Manager cluster for an existing installation
• Setting up a Global Link Manager cluster for a new installation in an
environment where other Hitachi Command Suite products are running in
a cluster configuration
• Setting up a Global Link Manager cluster for removal
When you perform each installation, see the following subsections.
Table 4-1 Subsections to Be Referred to When Performing a Installation
Type of installation and cluster setup
When no other
Hitachi Command
Suite products
have been installed
When other Hitachi
Command Suite
products are
running in a
cluster
configuration
New installation 4.2.1 4.2.4
Reinstallation or version upgrade
installation
4.2.2
4.2.2
#
Removal 4.2.5 4.2.5
Changing from a non-cluster configuration
to a cluster configuration
4.2.3
4.2.3
#
# These setup procedures assume that no other Hitachi Command Suite
products have been installed. For details about how to set up the clusters of
other Hitachi Command Suite products, see the manual for each product.
Note:
• On all nodes that make up a cluster, the disk configuration must be the
same, and the installation folder for Global Link Manager must have the
same name (including the drive letter and path name).
• When you change the Global Link Manager server settings after the
installation in a cluster environment, specify the same settings on all
nodes.
Installing Global Link Manager Clusters for New Installations
Caution:
Installing Global Link Manager Clusters
4-3