HP XP7 Business Continuity Manager Release Notes (TK954-96001)

Table 17 Operation procedure of 4x4x4 Multi-Target configuration with Delta Resync
Difference from 3DC
Multi-Target configuration
ConfigurationDescriptionOperation procedure
Preparation
Arbitration paths and
command devices for 4x4
configuration are necessary.
1DCHardware setup
Bi-directional paths must be set
between P-L, P-R and L-R sites.
One or more Journal groups in each
site.
Arbitration paths and arbitration
command devices.
A command device is
necessary for each DKC.
1DCCreate a route list of 3DC Multi-Target
configuration that contains definition or
Route list
routes that start from each site. This
route list is equivalent to that of 3DC
Multi-Target configuration with Delta
Resync.
Once a route list is defined, establish
routes according to the route list.
Cnt Ac-S must be with C/T ID,
and Cnt Ac-J must be of 4x4
1DCCreate a copy group definition file for
TC between P-site and L-site (G1/G4),
Definition of copy pairs
Cnt Ac-J. See Table 15 (page
16) for more details.
4x4 Cnt Ac-J between P-site and R-site
(G2/G5), and 4x4 Cnt Ac-J between
L-site and R-site (G3/G6).
None2DCEstablish Cnt Ac-S copy group
(G1/G4).
Establish Cnt Ac-S copy
pairs (G1/G4)
None3DCEstablish Cnt Ac-J copy group (G2/G5).Establish Cnt Ac-J copy
pairs (G2/G5)
None3DCEstablish Delta Resync Cnt Ac-J copy
group (G3/G6) into HOLD status.
Establish Delta Resync Cnt
Ac-J copy pairs (G3/G6)
Normal operation
None3DCKeep DUPLEX status on both Cnt Ac-S
(G1/G4) and Cnt Ac-J (G2/G5) copy
groups.
....
Documentation feedback
HP is committed to providing documentation that meets your needs. To help us improve the
documentation, send any errors, suggestions, or comments to Documentation Feedback
(docsfeedback@hp.com). Include the document title and part number, version number, or the URL when
submitting your feedback.
18 Documentation feedback