HP XP7 Business Continuity Manager User Guide (TK954-96005)

Preparing
1. From the primary site, execute the YKSUSPND command for the Continuous Access Journal Z
EXCTG.
YKQUERY
YKSUSPND
YKEWAIT GOTO(SUSPEND)
2. Start remote site storage system maintenance.
Change the configuration to a 2DC configuration in which operation is performed from the
primary site.
498 Maintenance and troubleshooting operations