HP XP7 Site Preparation Guide (H6F56-96012)
Figure 5 Service clearances for a three rack system (right module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 12 (page 23).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 12 Floor load rating and required clearances for a three rack configuration (right module)
Required Clearance (a+b) mFloor Load
Service clearance, floor cutout, and floor load rating 23