HP XP7 Business Continuity Manager User Guide (TK954-96005)
• YKMAKE HOLD
• YKEWAIT GOTO(HOLD)
8. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation startup procedure” (page 454).
9. Use Remote Web Console to set a Delta Resync control path required for each copy pair.
Operation is returned to normal.
Operating procedure during a path failure between the primary storage system and
the local storage system
The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.
Preparing
To prepare for maintenance:
1. Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.
480 Maintenance and troubleshooting operations