HP XP7 Site Preparation Guide (H6F56-96012)

Figure 6 Service clearances for a four rack system (left module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 13 (page 25).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
Table 13 Floor load rating and required clearances for a four rack configuration (left module)
Required Clearance (a+b) mFloor Load
Clearance (c) mRating
(kg/m2)
C=1.4C=1.0C=0.8C=0.6C=0.4C=0.2C=0C=-0.3
00000000Over 700
00000000.1600
000000.20.40.8500
Service clearance, floor cutout, and floor load rating 25