HP XP7 Site Preparation Guide (H6F56-96012)
Figure 7 Service clearances for a four rack system (right module)
*1 Clearance (a+b) is based on the floor load rating and the clearance (c). Floor load rating and
required clearances are shown in Table 14 (page 27).
*2 Clearance (d) is required over 300mm to open the front door. In the case that the clearance
(d) is less tan the clearance (a), give priority to clearance (a).
*3 Clearance (e) is required over 200mm to open the rear door. If clearance (e) is less than
clearance (b), give priority to clearance (b).
Table 14 Floor load rating and required clearances for a four rack configuration (right module)
Required Clearance (a+b) mFloor Load
Service clearance, floor cutout, and floor load rating 27