HP XP7 Continuous Access Journal for Mainframe Systems User Guide (TK911-96001)

DescriptionStatus
An operation for splitting or deleting the mirror is in progress.Stopping
An operation for splitting or deleting the mirror is finished.Stopped
A Cnt Ac-J delta resync pair has been created. It is ready for the delta resync operation.Hold
A Cnt Ac-J delta resync pair is being created.Holding
An error occurred with the Cnt Ac-J Z pair during the delta resync operation.Hold(Failure)
Monitoring Cnt Ac-J Z remote connections, path status
Use the following procedure to navigate to remote connection and remote path status. For remote
path status definitions and troubleshooting, see “Remote paths status probelms” (page 115).
Procedure 22 To view remote connection status, path information
1. In the Storage Systems tree, click Replication > Remote Connections. Check the Status field.
2. To view more information, click Actions > Remote Replication > View Remote Connection
Properties. Remote connection properties including path information displays in the window.
You can see similar information, along with a graphic representation, in the Remote Connections
> Connections (To) tab.
Monitoring Cnt Ac-J Z remote connections, path status 89