Fabric Clustering System 24-port 4x Fabric Copper Switch Installation Guide, March 2005

ProLiant Linux Installation Overview & Planning
Install HP Fabric Clustering System Switches
Chapter 2
23
Step 5. Fit the sliding rails over the fixed rails with the flanges facing outward until the flanges meet the
rack.
Figure 2-8 Fit Sliding Rail over Fixed Rail
Step 6. Attach the rails to the rack, both sides as shown in Figure 2-9.
CAUTION Keep switch supported until rail is attached to the rack.
Figure 2-9Attach Sliding Rail to Rack
Step 7. Securely attach all rails to the rack.
Remove Shipping Sleeve
Underneath each power supply is a shipping sleeve. Remove the shipping sleeve only if the rack is in its final
location. If you plan to transport the rack, leave the sleeve installed. To remove the sleeve, take the bezel off
and remove the entire sleeve by gently pulling on the tab. Replace the bezel.
Figure 2-10 Remove Shipping Sleeve From Under Power Supply