HP Performance-Optimized Datacenter, 6 m (20 ft) User Guide
Installation 15
o
If your HP POD is located inside, HP recommends connecting each drain to the local drain line.
o If your HP POD is located outside, then you can choose to either:
— Connect to the local drain line
— Enable the water to drain off freely in your location
Connecting the power
IMPORTANT: A licensed electrician must connect the power according to the local electric
code, consistent with supplier and consulting engineer drawings.
1. Connect the main power leads from your facility to the HP POD.
The HP POD is available in North American and International models.
o The North American HP POD includes step-down isolation transformers and requires two 400A,
480V, 3-phase delta feeds at 50-60 Hz.
o The International HP POD does not require transformers and requires two 400A, 380-415V, 3-
phase wye feeds at 50-60 Hz. All 3-phase HP POD feeders require that the neutrals and the
equipment grounding conductors remain isolated. Bonding of the B conductor (1) and the A
conductor (2) is allowed at the power source only.
2. Turn on facility power.