HP Performance-Optimized Datacenter, 6 m (20 ft) User Guide

Environmental control system 36
2.
Click File>Connect.
3. Enter the ECS controller IP address and then click OK.
ECS overview
The main page provides an overview of all HP POD telemetry data
This page also shows the active fan step in each zone within the HP POD.