HP POD and component maintenance schedule
Component to be inspected Frequency
Electrical connections and wiring—Visual Every 30 days
Electrical connections and wiring—Thermal scans Every 180 days
Air filter replacement (HP offers an air media kit, part number AT979A)
Every 30 days (* or as
required)
Condensation and water main drainage system (leaks)—Visual Every 30 days
Condensation and water main drainage system (leaks)—Functional Every 90 days
Busway interconnects (tightened) Every 180 days
Water quality Every 120 days
EPO system Every 180 days
Third-party OEM components (fire alarm/suppression system, humidifier,
and so on)
For cut sheets of each
component, see the operator
and maintenance
documentation
* If filter consistently needs replacement at 20 days, increase the frequency of inspections.
After moving the HP POD inspect and tighten all electrical connections.
Periodic maintenance
Perform periodic inspections to ensure the HP POD will continue to perform to design parameters. During
period inspections, pay special attention to electrical connections and wiring.
Electrical connections and wiring
Perform visual inspections every 30 days of all wiring terminations.
Perform thermal scans every 180 days of all wiring terminations.
Electrical busway maintenance
Periodically tighten the electrical busway connections. HP recommends tightening the electrical busway