HP Performance Optimized Datacenter (POD) 20c Site Preparation and Requirements Guide - China
Site requirements 10
Top view clearances shown
Side view for multiple POD installation minimum clearances shown
Adequate space around the HP POD 20c is necessary for minimum door clearance.
These minimum clearances provide room for door opening only. Consider additional space as necessary for
your site.
Safety and clearance area
WARNING: Check for electrical distribution and transmission lines in, over, and under the
construction site and maintain a safe working clearance from energized electrical lines. Consult
your local utility company or AHJ for required clearances.
Verify the following clearances prior to delivery: