HP Performance Optimized Datacenter (POD) 20c Site Preparation and Requirements Guide - China

Site requirements 12
Grounding feature Specification
Grounding lugs
Grounding lugs cannot be attached to any painted surface.
Grounding lugs must be compression-type 2-hole lugs and UL listed specifically for
grounding.
Ground rod system or
ground well
The customer must provide an effective grounding system with a ground rod or a
ground well.
IMPORTANT: Before installing the HP POD 20c, consult your local AHJ for applicable codes and
to review site-specific location guidelines. If needed, obtain any necessary permits.
The following figure shows the grounding electrode conductor connection that is located on the hot aisle side
of the HP POD 20c at the utility end.
Side view shown
Utilities
Consider the proximity to required utilities, such as power, water, and network connections. While the
required utilities can be brought to nearly any selected site, there is the potential for increased costs and
decreased efficiency when the HP POD 20c is located farther from the utility sources.
For utility clearance information, see "Dimensions and clearances (on page 8)."
Humidifier water supply
The HP POD 20c requires supply water for the humidifier. The supply water must meet the following
requirements.
Requirement Specification
Pressure
Between 20 and 110 psi, 0.1 and 0.8 MPa
Temperature
Between 1º and 40°C (33º and 104°F)
Minimum flow rate
1.45 lpm (0.12 gpm)
Connection
1.9 cm (.75 in) G
Adapter to 1.9 cm (.75 in) FPS
Hardness
No greater than 40°fH (equal to 400 ppm of CaCO
3
)
Conductivity
100 to 1250 μS/cm