HP Performance Optimized Datacenter (POD) 20c Site Preparation and Requirements Guide - China

Site requirements 16
IMPORTANT: All 3-Phase Wye feeders for the HP POD 20c require that the neutrals and the
equipment grounding conductors remain isolated. Bonding of the two conductors is allowed at
the power source only.