HP Performance Optimized Datacenter (POD) 20c Site Preparation and Requirements Guide - China

Index 36
A
about this guide 5
areas prone to lightning or power surges 21
assembly 30
assembly area 23
C
central facility infrastructure connections 17
clearance area 8, 10
cold weather considerations 21
connection portals 17
connections, additional 17
connections, facility 17
D
delivery considerations 30
dimensions 8
drainage 13
E
electrical power capacity 7
electrical system 15
environmental considerations 21
environmental control system (ECS) 17
environmental risks 21
equipment, installation 23
expansion 11
F
facility connections 17
fire and safety 20
fire suppression 5
future expansions 11
G
grounding requirements 11
H
HP site preparation drawing package 22
humidifier 19
I
installation 23
installation equipment 23
IT cable portals 17
L
lifting layout and requirements 23
lightning protection 21
M
materials, piping 14
mechanical cooling capacity 7
N
network connections 17
O
other objects 24
overview 5
P
permit requirements 22
piping materials 14
portals, connection 17
power infrastructure installation 15
power surges 21
pre-delivery 30
preparing for assembly 30
project coordination 22
proximity to utilities and drains 12
S
safety information 5, 10
security 5, 20
seismic activity 21
site assessment 5, 22, 26
site assessment checklist 26
site pad 8
Index