HP Performance Optimized Datacenter (POD) 40c G2 Maintenance and Service Guide

Removal and replacement procedures 31
2.
Unscrew the EPO LED indicator bulb.
Replacing the EPO LED indicator
1. Screw the new EPO LED indicator bulb into the module.