HP Performance-Optimized Datacenter, 12 m (40 ft) User Guide
Optional components 40
The standard cables should allow for placing the transformer and switchboard approximately 3.0 m (10
ft) away from the HP POD. Installation costs assume that connections are within the 3.0 m (10 ft)
recommendation. If you place the transformer and switchboard more than 3.0 m (10 ft) away from the HP
POD, additional planning and costs are involved.