HP Performance Optimized Datacenter 240e North America (Adiabatic) Maintenance and Service Guide
Removal and replacement procedures 23
Removing the busway drop box
1. Turn the power off by opening both breakers on the busway drop box (1).
2. Disconnect the PDUs that are connected to the busway drop box (2).
3. Use a socket wrench to loosen and remove the bolt securing the busway drop box to the retaining
hardware bracket (1).
4. Slide the hardware bracket to the right along the busway, completely disconnecting it from the busway
drop box (2).
WARNING: Use caution when removing and replacing the busway drop box. The drop box
weighs approximately 9 kg (20 lb).