HP Performance Optimized Datacenter 240e North America (Adiabatic) Maintenance and Service Guide

Removal and replacement procedures 25
4.
Secure the busway drop box to the retaining hardware bracket by using a socket wrench to insert and
tighten a bolt (4).
5. Connect the PDUs to the busway drop box (1).
6. Turn the power on by closing both breakers on the busway drop box (2).