HP Performance Optimized Datacenter 240e North America (Adiabatic) Maintenance and Service Guide
Maintenance 41
Maintenance
Periodic maintenance
Perform periodic inspections to be sure the HP POD 240e NA continues to perform to design parameters.
During period inspections, observe the following guidelines on electrical connections and wiring.
Qualified personnel
Qualified personnel are identified as personnel who are:
• Properly trained in the operation and maintenance of the HP POD 240e NA
• Customer-authorized to conduct maintenance activities
Qualified personnel can be:
• HP personnel
• Agents for HP
• Site maintenance personnel
Adiabatic
Component to be inspected Task Frequency Capable party
Air filtration
Inspect the pre-filter and main
filter. Replace as necessary.
Quarterly Qualified personnel
—
Replace the main filter. Annually Qualified personnel
—
Verify that the air pressure/flow
switch is operational. Replace as
necessary.
Annually Qualified personnel
Exhaust fan
Inspect hot aisle exhaust fans.
Clean as necessary.
Quarterly Qualified personnel
—
Inspect hot aisle exhaust fan
dampers. Clean as necessary.
Quarterly Qualified personnel
Evaporator (supply) fan
Inspect the following evaporator
fan parts for any damage:
•
Motor
•
Mounts
•
Wiring
•
Belts
•
Shrouds
•
Wheel
Verify fan vanes are free from
debris. Tighten the blower wheel if
necessary.
Quarterly Qualified personnel