HP Performance Optimized Datacenter 240e North America (Adiabatic) Maintenance and Service Guide

Maintenance 46
Life safety
Component to be inspected Task Frequency Capable party
Manual EPO shunt trip
EPO functional test
Manually initiate EPO shutdowns
with the six internal and external
push buttons (if installed) in
succession. Verify that all
shunt-trips on all panels trip.
Annually Qualified personnel
Thermal EPO shunt trip
EPO functional test
Initiate a thermal (automatic) EPO
shutdown via EPO temperature
switches that are located in the
hot aisle. Verify that all shunt-trips
on all panels trip.
Annually Qualified personnel
EPO system test
EPO non-functional test
Perform a functional test by
rotating the EPO mode keyed
switch through all modes. Verify
the following indicators.
Armed mode
Power=white
Armed=white
Bypass mode
Bypass=green
Test mode
Test=amber
Press the EPO button (each in
succession) and thermal trip to
verify the following indicators:
Reset=white
Audible alarm
Visual strobe alarm
Replace lights upon failure.
Annually Qualified personnel
Emergency lighting
Verify the emergency lighting is
visible when all lighting is off and
the POD doors are shut.
Every 2 years Qualified personnel
Exit signs
Be sure signs are illuminated.
Replace as necessary.
Every 2 years Qualified personnel
Emergency egress
Visually inspect and test the
operation of the emergency
egress panic bars on the
personnel access doors.
Every 2 years Qualified personnel
Access control maintenance schedule
Component to be inspected Task Frequency Capable party
System functional test
Visually inspect and test the
operation of the door access
contact switches.
Annually Qualified personnel