HP Performance Optimized Datacenter 240e North America (Adiabatic) Maintenance and Service Guide
Maintenance 47
Component to be inspected Task Frequency Capable party
—
Visually inspect and test the
operation of the door access card
readers, electric strikes, and door
release switches at each
personnel door and in each
personnel door panic bar.
Annually Qualified personnel
HP POD 240e NA structure
Component to be inspected Task Frequency Capable party
Complete structure
Visually inspect the structural
integrity.
Annually Qualified personnel
—
Inspect the door operation and
visually inspect the door gaskets
for evidence of water and air
leaks.
Annually Qualified personnel
—
Visually inspect the paint. Perform
prep and touch-up as necessary.
Annually Qualified personnel
Section seal
Visually inspect the cold aisle to
hot aisle seals. Repair as
necessary.
Annually Qualified personnel
Rain gutters
Visually check drains for blockage.
•
Monthly, if
staffed
•
Quarterly, if
not staffed
Qualified personnel
—
Functionally test drains, if allowed.
Quarterly Qualified personnel
Third-party components
All maintenance for third-party equipment will be defined by the manufacturer of the equipment. HP will, with
a defined and signed SOW, conduct all maintenance as identified by the original manufacturer.
Examples of external third party components that HP will conduct all manufacturer specified maintenance
with a signed SOW includes:
• External UPS equipment
Internal UPS and rack equipment that is purchased from HP is covered by a standard HP warranty and
services contract, purchased separately.
• Generators
• Switchgear
For maintenance activities for all third party equipment purchased as part of and delivered with the HP POD
240e NA, see the Operations and Maintenance Manual for the HP Performance Optimized Datacenter
240e North America. This manual might not cover equipment purchased through Critical Facilities Services.