HP Performance Optimized Datacenter (POD) 240a Site Requirements Guide
Site assessment 11
• Non-redundant facility-level one-line (reference only)
• External end view—Electrical cabinets
• Side view and section view—Power entry requirements
• External end view—Power pull box entry ports and pull box isolation paths
• External front view—Communication box
• Internal top view—Power distribution and satellite boxes
• Internal top view—Fire suppression (optional) and VESDA
• External top view—HP POD 240a clearance zone
• External top view—Load distribution within IT sections
• External bottom view—Load bearing footprint
• External bottom view—Load bearing footprint and weights
• External bottom view—Load distribution pads (site dependant)
• External end view—Clearance for indoor deployment
• External end view—Clearance between multiple deployments
• Possible view of multiple HP POD 240a deployments