HP Performance Optimized Datacenter (POD) 240a Site Requirements Guide
Appendix A: HP Site Assessment 29
Power requirements
Item Description Sign-off
1
Verify power underground work is completed according to the
approved conduit routing drawings that show the exact routes,
plan view, sections, and elevations.
2
Verify that temporary site power for installation and
construction is planned and available.
3
Verify adequate site power per HP POD 240a requirements.
General
Item Description Sign-off
1
Verify the utility connection including the main utility
transformers and metering equipment.
2
Verify the third-party commissioning services that might be
required by the owner.
3
Verify the HP Project Team and coordinates with other site
construction activities.