HP Performance Optimized Datacenter (POD) 240a Site Requirements Guide

System cooling 9
Verify the POD suppression system meets local codes, including specific local requirements for initial
and periodic inspections.
Arrange for and receive all required local permits, including initial commissioning.
Arrange for the connection of the agent tanks, refilling of tanks, and all system testing, including
pressure tests. All general maintenance of the suppression system must be completed by an authorized
SimplexGrinnell technician.
Any additional local requirements are not covered as part of the option price or basic installation and
deployment services, unless specifically included in an executed Statement of Work.