B-30
(1) Nut M8 (2) Flat washer 8 (3) Combined screw M6x12
(4) Spring washer 8 (5) Bolt M8x30 (6) Connecting plate for combining cabinets
Figure B-28 Install the connecting plate for combining cabinets
IV. Testing insulation
Switch the multimeter to the Megohm range and measure the resistance between the
fastening bolts M12×70 and the cabinets. If the resistance is larger than 5 Megohms,
you can finish the installation. If not, remove all installation components, and then
check whether the insulation components are installed or are damaged. Reinstall the
cabinets and test the insulation until the requirement is satisfied.
Figure B-29 illustrates a single cabinet installed on the cement floor and Figure B-30
illustrates a row of cabinets installed on the cement floor.