H3C S7500 Series Ethernet Switches Installation Manual
Installation Manual
H3C S7500 Series Ethernet Switches Appendix B N68 Cabinet Installation
B-51
(1) Cabinet (2) Guide rail (3) Support
(4) Bolt M12x30 (5) Spring washer 12 (6) Flat washer 12
(7) Front holder (8) Holder fixing piece (9) Side holder
Figure B-49 Install holders
II. Adjusting the height of the antistatic floor holders
Adjust the holder height so that the upper surface of the holder is flush with the lower
surface of the antistatic floor.
III. Cutting and restoring the floor
Cut and restore the antistatic floor based on the conditions around the cabinets.
Figure B-50 shows the cabinets installed on the raised antistatic floor.