zl Management Module Replacement Instructions 2007-08

Replacement Management Module
Instructions
for the ProCurve Series zl Switches Management Modules
The switch does not have to be powered off, however when the management module is removed all
ports will lose communication. ProCurve Networking recommends replacing the Management
module, flash disk or battery (on the Management module) during scheduled down time.
1. On the module unscrew the retaining screws enough to disconnect them from the threaded
holes in the switch.
2. Using the extractor handles, pull the module out from the slot.
3. Remove the flash disk from the failed module and install it into the replacement module.
4. Remove the battery from the failed module and dispose of properly.
5. Install the new battery that came with the replacement module into the replacement module.
6. Install the replacement module into the switch.
7. Use an equal amount of pressure and push both extractor handles closed to completely seat the
module.
8. Tighten the retaining screws.
For a copy of the ProCurve Switch zl Modules Installation Guide, go to the HP Networking web site
www.hp.com/networking/support
. Auto Search on your switch model and then select the links:
Display selected
Product support information (manuals, FAQs, knowledge base)
Figure 1. 5406zl Management Module
Figure 2. Removing the Management Module
Retaining Screws
Extractor Handles

Summary of content (2 pages)