Installation and Getting Started Guide for 720wl/740wl/760wl 2004-03
Hardware Installation
Site Planning Checklist
Before installing an Integrated Access Manager 760wl, Access Control Server 740wl, or Access Controller
720wl, you should evaluate the items in the following site planning checklist:
Space Evaluation
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
Environmental Evaluation
• Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Airflow
Power Evaluation
• Input power type
• Proximity of receptacle to equipment
• UPS for power failures
Grounding Evaluation
• Circuit breaker size
Cable and Interface Equipment Evaluation
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
EMI Evaluation
• Distance limitations for signaling
• Site wiring
• RFI levels
2-8 HP ProCurve Secure Access 700wl Series Installation and Getting Started Guide