Getting Started Guide for Wireless EDGE Services xl Modules 2007-07

10
Getting Started
Verify 5300xl Switch Software
Start a console session. The following CLI commands show the switch soft-
ware version. The ProCurve 5300xl Switch software must be version E.10.30
or later.
Step 2 - Boot up the system.
1. After powering on the wireless services-enabled Switch 5300xl, LEDs
blink as follows:
LEDs on the top of the 5300xl light immediately. After the system is
initialized, only the LEDs associated with the modules that are
installed remain lit.
After several seconds, the multiple LEDs on the PoE xl Module and
on the 10/100-TX xl module light and blink frequently.
On the Module, the ’Module Activity’ LEDs light, indicating the
percent of the start-up process completed. The ’Module Fault’ LED
also lights at this time. When self-test has passed,
the ’Module Fault’ LED goes out, the 80% LED light goes out, and
the ’Module Ready’ LED blinks for a few seconds, as the Module
and its applications initialize.
When the ’Module Ready’ LED is solidly lit, the wireless services-
enabled Switch 5300xl and Module are ready to use.
2. Simultaneously, the connected radio ports power-up, and their LEDs blink
as follows during start-up operation:
The amber and green LEDs immediate light for several seconds.
Then, the green light goes out and the amber lights blinks approxi-
mately once per second.
If the Country Code is not set in the Module, the amber light
continues to blink, with the green light out. This radio port is in
the unadopted mode.
If the Country Code is set, then the start up process will continue
as described in the next two bullets.
ProCurve# show version
Image stamp: /sw/code/build/alpmo(lor)
Jan 23 2007 15:41:58
E.10.30
255
Boot Image: Primary
ProCurve#