Riverbed® Steelhead® RiOS® Application Installation and Getting Started Guide 2010-10
Table Of Contents
- 1: Overview
- 2: Hardware Installation
- 3: Getting Started
- Initial Configuration
- Configure the Steelhead Application
- A: EMC Regulatory Statements
- B: Waste Electrical and Electronic Equipment (WEEE) Statements
- C: Hardware Components
- D: Software Components

2-3
Hardware Installation
When you install the Extended Services zl Module for the first time, it
boots directly to the Steelhead Application, where it should remain during
both the initial setup and normal operations.
Initially, you will need to activate the Steelhead application by obtaining
a license from Riverbed and following the process outlined “Activating
the Token and Installing the Steelhead Application Licenses” on page 3-19
in Chapter 3: “Getting Started.”
Figure 2-2. The Extended Services zl Module Hard Drive
Note The printed version of this document contains the basic information needed
to get you started using the module. It also contains EMC Regulatory State-
ments (Appendix A) and Waste Electrical and Electronic Equipment (WEEE)
Statements (Appendix B). Appendices C and D are only in the Web version of
this document at www.hp.com/networking/manuals. Appendix C gives more
detailed hardware information, and Appendix D gives more detailed software
information.