Riverbed® Steelhead® RiOS® Application Installation and Getting Started Guide 2010-10
Table Of Contents
- 1: Overview
- 2: Hardware Installation
- 3: Getting Started
- Initial Configuration
- Configure the Steelhead Application
- A: EMC Regulatory Statements
- B: Waste Electrical and Electronic Equipment (WEEE) Statements
- C: Hardware Components
- D: Software Components

C-6
Hardware Components
Switch LEDs
Switch LEDs
The following figures show the Test, Fault, and Module Status LEDs on the
switches the module can be installed in.
Figure C-4. Test, Fault, and Module Status LEDs on a Series 5400zl switch
Figure C-5. Test, Fault, and Module Status LEDs on a Series 8200zl switch
Replacing or Removing a Module
It is highly recommended that the HP Extended Services zl Module be shut-
down before replacing or removing it. You can shut down the module with the
following HP zl switch CLI command:
hostzlswitch# services <slot-id> shutdown
For example:
hostzlswitch# services c shutdown
Module Status LEDsTest LED
Fault LED
Module Status LEDs
Fault LED
Test LED