HP BladeSystem c-Class Site Planning Guide

Index 72
A
AC power configurations 39
acoustic noise specification 17
air conditioning ducts 11
air conditioning equipment requirements, basic 9
air conditioning system guidelines 9
air conditioning system specifications 10
air conditioning system types 9
air distribution systems, basic 10
airflow requirements 19, 58
ASHRAE guidelines 7
authorized reseller 67
average floor loading 12
B
blanking panels 19
building distribution 35
C
cabinet performance grounding 37
cables 39
cabling requirements 11
cautions 58
circuit breaker sizing 31
computer room preparation 8
computer room safety 13
computer safety ground 36
configuration example 54, 55
configuration options 54
contact information 67
contacting HP 67
conversion factors 66
cooling requirements 9
customer self repair (CSR) 67
D
data communication cables 39
DC power supply 46, 50
delivery survey 64
distribution hardware 34
dust and pollution control 15
Dynamic Power Cap 39
E
earth leakage current 35
electrical conduits 35
electrical factors 29
electrical load requirements 31
electrical requirements 29, 31
electrostatic discharge 17
enclosure specifications 51
environmental requirements 15
environmental specifications 22
equipment clearance 20
F
fire protection 13
fire suppression 13
floor loading 12, 20
floor loading, average 12
floor loading, raised 12
formulas 66
front door clearance 23
G
general guidelines 7
grounding requirements 35
grounding systems 35
H
help resources 67
high frequency grounding 37
HP technical support 67
humidity 15
I
importants 58
industry guidelines for site planning 7
installation guidelines 38
installation precautions 13
installation schedule 62
introduction 6
Index