HP ProLiant DL360p Gen8 Server Maintenance and Service Guide

Table Of Contents
Removal and replacement procedures 38
4.
Attach the ground (earthed) wire to the ground screw and washer and tighten to 1.47 N m (13 lb-in) of
torque. The ground wire must be connected before the positive or negative lead wires.
5. Attach the power ring tongues to the terminal block, following the polarity label below the terminal
block, and then tighten the screws to 1.47 N m (13 lb-in) of torque.