Quick Deploy Rail System Installation Instructions (2U ball bearing and CMA) Copied

Connectingthepowercords
After completing all installation and cable management procedures, you can
connect the power cords to the facility power source.
WARNING: To reduce the risk of electric shock or damage to the
equipment:
•Do
notdisablethepowercordgroundingplug.Thegroundingplugis
an important safety feature.
•Plugthepowercordintoagrounded(earthed)electricaloutletthatis
easily accessible at all times.
•Unplugthepowercordfromthepowersupplytodisconnectpowerto
the equipment.
•Do
notroutethepowercordwhereitcanbewalkedonorpinched
by items placed against it. Pay particular attention to the plug, electrical
outlet, and the point where the cord extends from the server.
The installation is complete.
Preparing the product for integrated
shipping in a rack
IMPORTANT: You must provide screws to secure the slide mounting
bracket assemblies in a threaded-hole rack.
IMPORTANT: You will need kit 371482-B21 to prepare a round-hole rack
for integrated shipping.
NOTE: Use the integrated shipping hardware included with this kit to prepare a
square-hole rack for integrated shipping.
Installing the cable management arm
Reversing the cable management arm
orientation
The installation is complete.
Loosening the shipping screws
To slide the server out of the rack, open the latches and loosen the shipping screws.
Documentation feedback
HP is committed to providing documentation that meets your needs. To help
us improve the documentation, send any errors, suggestions, or comments to
Documentation Feedback (mailto:docsfeedback@hp.com). Include the document
title and part number, version number, or the URL when submitting your feedback