Compaq Parallel Database Cluster Model PDC/O1000 for Oracle8i and Windows 2000 Administrator Guide
Cluster Planning 4-9
Compaq Confidential – Need to Know Required
Writer: John Blackburn Project: Compaq Parallel Database Cluster Model PDC/O1000 for Oracle8i and Windows 2000 Administrator Guide
Comments:
Part Number: 225083-002 File Name: e-ch4 Cluster Planning.doc Last Saved On: 6/11/01 11:20 AM
Sample Large Cluster with One Non-Redundant
Fibre Channel Fabric
Figure 4-2 shows an example of a larger PDC/O1000 cluster with one
non-redundant Fibre Channel Fabric that contains six cluster nodes and six
RA4000/RA4100 Arrays.
Fibre Channel SAN Switch
Switch
(
Cluster
Interconnect)
Client
LAN
Node 3Node 5 Node 1
Node 2 Node 4 Node 6
RA4000/4100
Arrays (6)
Figure 4-2. Larger PDC/O1000 cluster with one non-redundant Fibre Channel
Fabric
The larger configuration shown in Figure 4-2 contains these hardware
components:
■ Six ProLiant servers (cluster nodes)
■ One Fibre Host Adapter in each cluster node
■ One Fibre Channel SAN Switch to connect the RA4000/RA4100 Arrays
to the Fibre Host Adapters
■ Six RA4000/RA4100 Arrays
■ One RA4000 Array Controller in each RA4000/RA4100 Array
■ Ethernet NIC adapters, cables, and Ethernet switches or hubs for the
Ethernet cluster interconnect (not shown)
■ Ethernet NIC adapters, cables, and switches or hubs for the client LAN
(not shown)