Compaq Parallel Database Cluster Model PDC/O1000 for Oracle8i and Windows 2000 Administrator Guide

Cluster Planning 4-9
Compaq Confidential Need to Know Required
Writer: John Blackburn Project: Compaq Parallel Database Cluster Model PDC/O1000 for Oracle8i and Windows 2000 Administrator Guide
Comments:
Part Number: 225083-002 File Name: e-ch4 Cluster Planning.doc Last Saved On: 6/11/01 11:20 AM
Sample Large Cluster with One Non-Redundant
Fibre Channel Fabric
Figure 4-2 shows an example of a larger PDC/O1000 cluster with one
non-redundant Fibre Channel Fabric that contains six cluster nodes and six
RA4000/RA4100 Arrays.
Fibre Channel SAN Switch
Switch
(
Cluster
Interconnect)
Client
LAN
Node 3Node 5 Node 1
Node 2 Node 4 Node 6
RA4000/4100
Arrays (6)
Figure 4-2. Larger PDC/O1000 cluster with one non-redundant Fibre Channel
Fabric
The larger configuration shown in Figure 4-2 contains these hardware
components:
Six ProLiant servers (cluster nodes)
One Fibre Host Adapter in each cluster node
One Fibre Channel SAN Switch to connect the RA4000/RA4100 Arrays
to the Fibre Host Adapters
Six RA4000/RA4100 Arrays
One RA4000 Array Controller in each RA4000/RA4100 Array
Ethernet NIC adapters, cables, and Ethernet switches or hubs for the
Ethernet cluster interconnect (not shown)
Ethernet NIC adapters, cables, and switches or hubs for the client LAN
(not shown)