HP ProLiant DL785 G5 and G6 Servers - Maintenance and Service Guide, Seventh Edition

6. Install together the Smart Array Controller into slot 1 and the SAS expander into slot 2
(“Expansion boards” (page 42)).
7. Route and connect the cables from the SAS expander to the SAS backplanes.
SAS expander cabling 79