HP ProLiant ML350p Gen8 Server User Guide
Hardware options installation 89
o
For rack models, if removed, install the security bezel (on page 21).
Eight-bay SFF drive cage option
Install the optional eight-bay SFF drive cage in drive cage bay 2 or drive cage bay 3.
To install an additional eight-bay SFF drive cage, an optional SAS controller is required. To obtain the option,
contact an HP authorized reseller.
Installing the optional SFF hot-plug drive cage
1. Do one of the following:
o For tower models, open and remove the bezel ("Remove the tower bezel" on page 21).
o For rack models, if installed, remove the security bezel (on page 21).
2. Power down the server (on page 20).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. For tower models, do the following:
a. Place the server on a flat, level surface with the access panel facing up.
b. Remove the access panel (on page 23).
5. For rack models, do the following:
a. Extend the server from the rack (on page 24).
b. Remove the access panel (on page 23).
c. Release thumbscrews and remove the rack bezel.
6. Remove the blank from box 2 or box 3.