HP StorageWorks Virtualization Services Manager v2 server user guide (5697-0137, September 2009)

WARNING!
This server is very heavy. To reduce the risk of personal injury or damage to the equipment:
Observe local occupational health and safety requirements and guidelines for manual material
handling.
Get help to lift and stabilize the product during installation or removal, especially when the product
is not fastened to the rails. When the server weighs more than 22.5 kg (50 lb), at least two people
must lift the server into the rack together. A third person may be required to help align the server
if the server is installed higher than chest level.
Use caution when installing the server in or removing the server from the rack; it is unstable when
not fastened to the rails.
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the
heaviest item first, and continue to populate the rack from the bottom to the top.
1. Install the server and cable management arm into the rack. See the installation instructions that
ship with the HP 1U Quick Deploy Rail System.
2. Connect the peripheral devices to the server. See Rear panel components on page 9.
3. Connect the power cord to the server.
4. Use the strain relief clip from the server hardware kit to secure the power cord.
5. Connect the power cord to the AC source.
Powering up and configuring the server
To power up the server, press the Power On/Standby button.
While the server boots, the RBSU and the ORCA utility are automatically configured to prepare the
server for operating system installation.
HP StorageWorks Virtualization Services Manager v2 server user guide 25